Wednesday: Pour Cetus slab. Build form for settlement chamber pour. Build wire mesh cage for form. Dig out underneath the bottom drain lines all the way back to the pond's outer wall at the 4 1/2' level; stub them off; attach 45's; run new pipe level with the bottom of the settlement chamber. Connect new flush to waste line. Set supports for the Clarity slab span. Tie all the TPR and bottom drain air lines back and out of the way. Dump gravel in prep for concrete pour tomorrow. No waste line = no water change. Koi did not appreciate being put on short rations. Thank God, Breda hasn't been out and seen the mess!


.

.

.

.

.

.

.

.

.

.