Thursday: It's concrete day! Bottom drain lines cut, 90'd up and capped. Gravel for base. Settlement chamber form and wire mesh screen placed and form foated. 4" pipe from SC to pipe boot on Cetus installed. 2" line for stand pipe overflow placed. Concrete SC mixed, poured and finished. Start construction of Clarity base.
.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.