View Single Post
Old 05-03-2008   #36 (permalink)
KoiCop
Honmei
 
KoiCop's Avatar
 
Join Date: May 2005
Location: Southern California
Posts: 2,505
Friday: Remove the forms. Chisel the concrete slag in the SC. Level and set the Cetus using sand. Hydraulic seal the SC pipes and cut them to length. Finish constructing the Clarity base, adding a spillway. Waterproof the SC. Cut block and stone. Start finishing stone work. Plaster the SC.


.

.

.

.

.

.

.
__________________
Don

Koi Kichi & Water Garden Club, AKCA
ZNA, Southern California
Southern California Koi Club, AKCA
CKHPA
KoiCop is offline   Reply With Quote