View Single Post
Old 04-29-2005   #8 (permalink)
MikeM
Honmei
 
MikeM's Avatar
 
Join Date: Dec 2003
Location: Orlando, Florida
Posts: 4,796
That was just the first day: Old pond completely disassembled. Test dig of filter pit done. (By side of house) And, everything in the way moved.

During the course of Day 2: How much equipment can fit in the confines of the yard? Well, how much is needed? .... and at 7:30pm, they are still hard at work ... usually until after darkness has fallen.
Attached Thumbnails
polyurea-spray-liner-pond-dsc01640.jpg  polyurea-spray-liner-pond-dsc01641.jpg  polyurea-spray-liner-pond-dsc01642.jpg  
MikeM is offline   Reply With Quote