View Single Post
Old 05-04-2005   #83 (permalink)
MikeM
Daihonmei
 
MikeM's Avatar
 
Join Date: Dec 2003
Location: Orlando, Florida
Posts: 5,212
Meanwhile, Justin is still working on the pond. The plastering of the block complete, he's turned his attention to laying a course of flagstone atop the capstone. The patio area and walkway around the pond eventually will be flagstone, but that is a different project. Justin is doing the flagstone at the pond edge so it slopes away from the pond "just right". When the polyurea liner is sprayed, it will meld the under surface with the pond. (Justin does such nice flagstone work I'm wishing he could stay over and do that project, too!)
Attached Thumbnails
polyurea-spray-liner-pond-dsc01745.jpg  
MikeM is offline   Reply With Quote