View Single Post
Old 09-16-2005   #7 (permalink)
redhotkoi
Tosai
 
Join Date: Jan 2005
Posts: 45
Hired a pump trailer to pump the concrete to the back yard to pour the footer for the pond and filter pit.

The last picture show the placement of the pond and filter pit.
Attached Thumbnails
new-koi-pond-being-built-27.jpg  new-koi-pond-being-built-28.jpg  new-koi-pond-being-built-29.jpg  
redhotkoi is offline   Reply With Quote