View Single Post
Old 09-21-2005   #31 (permalink)
redhotkoi
Tosai
 
Join Date: Jan 2005
Posts: 49
I will take some pictures tomorrow of the concrete work. It's going to be crazy tomorow alot to do before the concrete set. I had them come to do the two footer with 4.5 yard of concrete. It took 20 minutes to do the actual pumping.
redhotkoi is offline   Reply With Quote