View Single Post
Old 09-22-2005   #43 (permalink)
redhotkoi
Tosai
 
Join Date: Jan 2005
Posts: 49
Pumped 7 yarrds of concrete yesterday. To fill the block wall and floor in the filter pit.

We had a little problem yesterday with the lines getting clogged. I used metered concrete yesterday instead of ready mix (mixed at the plant) The mix is some time not at thorough you can get some dry clumps. That was a real pain.
Attached Thumbnails
new-koi-pond-being-built-55.jpg  new-koi-pond-being-built-57.jpg  new-koi-pond-being-built-58.jpg  new-koi-pond-being-built-59.jpg  new-koi-pond-being-built-60.jpg  

new-koi-pond-being-built-61.jpg  
redhotkoi is offline   Reply With Quote