|
jckoi- What process are you refferring to? I'm unkletim's son=) I'm the subcontractor on the job=) We have 50-75% of the plumbing done on the pond right now I finished up the manifolds for the returns and the skimmer last weekend and as soon as I get off work in a few hours I'll be finishing running the line..
Pond has four returns like my dad mentions as well as a 5th return fromt he waterfall into the pond, a surface skimmer, and the 4" bottom drain goes back to a 250gallon vortex then a 250gallon settling chamber, then into pump house to the advantage Bead filter with glass beads I beleive we're running, a huge 4ft long UV light, back flush system and all that good stuff, auto topoff of course.. Then back to the pond through two 1/4" HP?? or 1/2HP? I keep forgetting, Artesian Pumps which at this point I'm planning n running inline back to the pond.. I might end up running one for the returns and one for the skimmer Depending upon flow rates and such after I actually get water in there in a month or so..
aquitori-- Thanks for the offer=) We'll probably be in touch.. I really want a Shuro Utsuri and a Asagi.. but not for awhile unfortunately
__________________
10,000 gallon Gunite/polyurea Pond-Big UV, 2 1/3hp pumps, Sac Koi Beadfilter, 1500gallon settling chamber
|