While Bobby was over at the other pond construction site laying block, Carl and John dug the trench to connect the 2 northern bottom drains, 2 air pits and return to the filter pit. For those that know how tall Carl is can get a feel for how deep the trench had to be to reach the bottom drain lines (those connections are 10' down). Now all the bottom drain lines, pumped returns and air lines are in place. Tomorrow they should run the mid-level pick up and the bakki shower gravity return lines.