View Single Post
Old 01-28-2006   #113 (permalink)
HenryC
Tategoi
 
HenryC's Avatar
 
Join Date: Dec 2003
Location: Orlando, FL
Posts: 378
While Carl got the other pond construction just about caught up with mine, John and Bobby ran the rest of the plumbing from the pond. The two 4" pipes below are the bakki shower return lines. The small 1" line is the conduit for the underwater camera. The polyurea will be sprayed tomorrow so I will be able to get shots of that procedure.
Attached Thumbnails
henrycs-pond-construction-plumbing7.jpg   henrycs-pond-construction-plumbing8.jpg  
HenryC is offline   Reply With Quote