| yes I solid poured the entire pond and dropped a length of rebar in every other hole and ran rebar around the perimeter of the pond in several of the runs of block.
Once you do the math and figure out the amount of concrete needed, tell the representative of xypex how much of what type of concrete you will be using and he will give you the amount....I used about 9 of the ten gallon bucket that was shipped to me...i think that was for 15-20 eighty lb sacks of stucco.
You will use less, much less because the amount used is based on the amount of free lime available in the mix...there ain't no free lime in the agregate. |