| Quote:
Originally Posted by JasPR I had a swimming pool company quote me for a change and expansion on my current 7500 gallon pond. I could GC it myself but at 56 I'm not about climbing into excavations any more. So they seem confident, I'm confident that I can stay on top of them and keep them on the path to a 18,000 gallon pond. They are to take out the side wall of the existing pond, rebar into it and create a free form 'L' off of the original pond. The existing pond is deep and would become more shallow after the pour to incorporate it into the new section, but that would be fine as a resting/viewing and feeding area. Then the quote comes- ready------ excavation, rebar, pour ( pumper truck) and basic drains ( no filters as they are clueless). Raise 2 feet to meet a future decking, and no grading, finishing or decking. -------- $ 60,000. I suggested that they look for another idiot. JR | Hah!!!!! I'll come out and do it for $50,000.LOL   |
| |