| If I were blending two shells together I would use polyurea. The cost of the polyurea can partly offset by not surfacing the entire project with whatever plaster coat and concrete that you currently have in mind and you wouldn't have to give up any floor depth of the exhisting shell. Demo on the old section to be removed and exposing the rebar for tie in is a lot of work and a big expense. |