As promised, here are a few photos of the Bakki showers Koi by Keirin installed on a pair of ponds here in Orlando after AFKAPS.
The first shower is intalled on the Barroso's male pond. The pond previously had the skimmer feeding the stream that flowed back into the pond. They installed the shower at the top of the stream and just tied into the same plumbing, so this one is fed by the skimmer.
The other shower was installed on the female pond. Keirin also expanded the pond. The bottom drain from the new expansion feeds an Aquadyne 4.4 which is then pumped to the Bakki shower.
The shower was originally installed on top of the bog area at the top of the waterfall, but it blocked the view of the fern, so it was moved behind the fence.
They had to build a platform so that the shower was high enough to flow back to the waterfall. The first thing I did was shake the heck out of it. It is very sturdy.