![]() |
| |||||||
| General Koi Forum The main koi forum. Most posts should be made here. |
![]() |
| | LinkBack | Thread Tools | Display Modes |
| | #31 (permalink) |
| Sansai Join Date: Jul 2007
Posts: 162
| Thank you Don. Very nice. I really like all the rock you've used, and I don't want to insult those who know what it is. But the Japanese "tower" is well placed and gives it a subtle peacefulness. You must really enjoy a cold <insert beverage of choice> sitting by your pond. And now it's going to be even better, with less maintenance. Grant |
| | |
| | #32 (permalink) | |
| Oyagoi Join Date: Oct 2004 Location: Lakewood, So Calif
Posts: 1,814
| Quote:
You have been screwed again. those are knock offs, notice the outside stitching and the color. Also they did not attach the handles correctly. Looks like you will be carrying my purse and luggage for me. I can see it now, you following me around the mall with my new designer purse, I will have so much more space, to carry all the esentials, I believe that purse has a 50lb capacity ![]() | |
| | |
| | #33 (permalink) |
| Oyagoi Join Date: May 2005 Location: Southern California
Posts: 2,468
| Thursday: It's concrete day! Bottom drain lines cut, 90'd up and capped. Gravel for base. Settlement chamber form and wire mesh screen placed and form foated. 4" pipe from SC to pipe boot on Cetus installed. 2" line for stand pipe overflow placed. Concrete SC mixed, poured and finished. Start construction of Clarity base. . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() .
__________________ Don Koi Kichi & Water Garden Club, AKCA ZNA, Southern California Southern California Koi Club, AKCA CKHPA |
| | |
| | #36 (permalink) |
| Oyagoi Join Date: May 2005 Location: Southern California
Posts: 2,468
| Friday: Remove the forms. Chisel the concrete slag in the SC. Level and set the Cetus using sand. Hydraulic seal the SC pipes and cut them to length. Finish constructing the Clarity base, adding a spillway. Waterproof the SC. Cut block and stone. Start finishing stone work. Plaster the SC. ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() . ![]() |
| | |