I hired a real company today and they will dig it and remove the dirt. They will also put 6.5 yards of stone in it so it will be ready for my 10 inch pour. But they are useing two pieces of equipment with two operators. And the job will cost $1300. It should be done the beginging of next week. I hate to pay soo much but its a tight space to work in with my house/landscaping. They say they need a small excavator that can fully rotate ($500 a day) and a front loader to keep moving the dirt.
Mike C
__________________
My wife say its my Koi or her. Im sure gonna miss her.
I have 650 block and a ton of rebar being delivered this friday. Matt from Sugarloaf Koi is comming next week to help me do the plumbing so I can get the floor poured.
Mike C
Getting dug in the am. This is the final markings for the dig. 26ft by 10ft by 7.5 ft deep. It will be 6ft deep after the gravel/concrete pour and will hold roughly 12,000 gal.